
The Problem
A hog farm located in southeast US was faced with a 5,500,000-gallon waste lagoon that had gone septic. The lagoon had no presence of biological activity and the solids build-up on the surface of the lagoon was at a critical state.
The Solution
CR Foundation BR-1 treated the waste lagoon with a single application of the CR Foundation BR-1 product at a level of 45 PPM (250 gallons). There was an immediate noticeable reduction in offensive odors coming from the lagoon. Within 14 days, the lagoon was showing signs of increased biological activity and asubstantial reduction in surface solids. At 21 days after treatment, the lagoon was extremely active with biological activity.
Conclusion
The CR Foundation BR-1 product solved the TSS and BOD problems in the waste lagoon after a single treatment. The lagoon was functioning properly 21 days following treatment.